Data
| IP klass | |
|---|---|
| Dimmerdatav (hämardatav) | |
| Bränd | |
| Laos (Peetri, Vana-Tartu mnt 79A) | Ei |
| Tarneaeg (kui toode ei ole Eesti laos) | 7-14 päeva |
Components for surface-mounted track system Accessories for tracks Trinity
1 × 7,00 €
Maytoni 1F pinnapealse siini otsakork valge
1 × 5,00 €
3-PH TRACKLIGHT FOCUSABLE 24W 3000K 20°-55°, WHITE MATT, DALI DIMMABLE
2 × 135,00 €
Sys-One wireless PWM controller IP66, 4 channel, 12-36V 4x5A, 48V 4x2A
2 × 110,00 €
4 zones remote control with 3 scene memories for 4 zones PWM dimmer No. 115484
1 × 34,00 €
AURORA G-LitePRO IP65 Ø10cm süvisvalgusti "drive-on" GU10
1 × 34,00 €
Daylight sensor passive for parallel connection into active 1-10V control signal wires
1 × 43,00 €
Components for surface-mounted track system Accessories for tracks Trinity
1 × 7,00 €
Maytoni 1F surface track power input end white
1 × 7,00 €
LED recessed and under-cabinet light MiniAMP white, 3W, 24V DC, neutral white, dimmable
1 × 33,00 €
LED draiver 350mA 1-9W CC
1 × 15,00 €
LED downlight MiniAMP black, 3W, 24V DC, warm white, dimmable
1 × 33,00 €
Universal Push dimmer for dimmable 230V lamps/transformers, 300VA
1 × 56,00 €
Components for surface-mounted track system Accessories for tracks Trinity
1 × 12,00 €
FastFix LED linear system IP54 start-/power infeed module
1 × 48,00 € Vahesumma: 824,00 €
7-14 päeva
3,00 €
Price without 24% VAT: 2,42 €
| IP klass | |
|---|---|
| Dimmerdatav (hämardatav) | |
| Bränd | |
| Laos (Peetri, Vana-Tartu mnt 79A) | Ei |
| Tarneaeg (kui toode ei ole Eesti laos) | 7-14 päeva |
Only logged in customers who have purchased this product may leave a review.

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

for a 1,5m LED module bar five lens plates are needed
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

for a 1,5m LED module bar five lens plates are needed
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva

8 x 2,5qmm pre-wired (L1 / L2 / L3 / L’ / N / PE / Dim+ / Dim-), incl.
7-14 päeva

3-phase switchable, incl. five pre-mounted and exchangeable lens optic
7-14 päeva


Arvustusi pole veel