Data
| Laos (Peetri, Vana-Tartu mnt 79A) | Ei |
|---|---|
| Bränd | |
| Tarneaeg (kui toode ei ole Eesti laos) | 7-14 päeva |
ENLITE M-Lite 6pack niiskuskindlad IP67 markervalgustid 3.6W sinine
1 × 45,00 €
DYN
2 × 78,00 €
Corner Connector for profile DIVE24//SURF24 90°, 4x Set
1 × 8,00 €
Valgusvooliku IP44 start pistik adapteriga 1.5m
1 × 9,95 €
Laelamp HiTech 24W 3000K 1920lm 35cm must/kuldne
1 × 35,00 €
LED paneel RUUT 12W 16.3x16.3cm 2700K 890lm 120°
1 × 10,00 €
Sys-Pro single-color 1 zone remote control round, white
1 × 22,00 €
LED profile plastic cover cutting tool
1 × 65,00 €
DALI DT8 RGB+W 1 group built-in touch master controller, black, 100-240V AC or DALI bus voltage
1 × 125,00 €
Seinavalgusti TUBA G9 must/kuld
1 × 48,00 €
LED retrofit circuit board 160mm, 14W, neutral white, with holding magnet and HF-motion sensor
1 × 58,00 €
Tri-proof lightbar 1260mm 40W CCT emergency
1 × 144,00 €
AKIRA
1 × 46,00 €
BREE
1 × 46,00 €
INSIDE
1 × 43,00 €
GU10 pirni süvistamisrõngas Ø8.5cm IP65 must Maytoni Technical Deep
1 × 16,00 €
NIGIRI
1 × 449,00 €
LED downlight LUNA 8W, indirect light, white, warm white
1 × 29,00 €
rippvalgusti BOWL Ø40cm 1xE27 must/kuldne
1 × 48,00 €
Laevalgusti GX53 10.8x9.2cm IP54 antratsiit
1 × 44,00 €
Lühter V.S 3xE14 Ø30cm konjak/must
1 × 72,00 €
ANSELL Vasco 150CM 60W LED 110° 3000K/4000K/6000K 6075lm must
1 × 149,00 €
*Kandiline pinnapealne/süvistatav LED valgusti 3000K 1500lm valge
1 × 12,00 €
Backlight Finelli
1 × 118,00 €
AGOSTO
1 × 52,00 € Vahesumma: 1849,95 €
7-14 päeva
2,80 €
Price without 24% VAT: 2,26 €
| Laos (Peetri, Vana-Tartu mnt 79A) | Ei |
|---|---|
| Bränd | |
| Tarneaeg (kui toode ei ole Eesti laos) | 7-14 päeva |
Only logged in customers who have purchased this product may leave a review.

Väikse voolutarbivusega ja soodsa m hinnaga professionaalne multifunk
7-14 päeva

Separation point: 100mm with 6 SMD each | Pitch (chip centre-to-centre
7-14 päeva

Separation point: 25mm with 6 SMD each | Pitch (chip centre to centre)
7-14 päeva

Separation point: 100mm with 12 SMD each | Pitch (chip centre-to-centr
7-14 päeva

Separation point: 50mm with 6 SMD each | Pitch (chip centre-to-centre)
7-14 päeva

Separation point: 50mm with 6 SMD each | Pitch (chip centre-to-centre)
7-14 päeva


Arvustusi pole veel