Data
| Width (mm) | |
|---|---|
| Length (mm) | |
| Dimmable (adj. brightness) | |
| Brands | |
| In stock (Vana-Tartu mnt 79A) | No |
| Out of Stock Delivery Time From Supplier | 7-14 Days |
End cap EC66 aluminum silver for profile 2SIDE, 2 STK, incl. screws
1 × 8,00 €
AURORA PRINCETONPRO™ 1.2m 20W 4000K 2200lm 110°
1 × 119,00 €
ENLITE waterproof IP67 markerlights kit M-Lite 6pack blue
1 × 45,00 €
4mm LED CRI930 MICRO strip 24V 10W 910lm/m 3000K 240LED/m 5m
1 × 94,00 €
AR70 7W 2000-2700K | 36° | Flame Dimming | GU10
1 × 34,00 €
FastFix LED linear light S, IP40, 1.5m, 25-75W, 4000K, 30°,UGR<19, 1-10V dimmable
1 × 158,00 €
Step-By-Step Stair controller with motion sensors
1 × 215,00 €
ANSELL Vasco 120CM 50W LED 110° 4000K/4000K/6000K 5000lm
1 × 120,00 €
FastFix LED linear system replacement lens 90° beam angle
1 × 12,00 €
LED HEQ940 flex stripe High Bright, 24V, 12W, IP20, 4000K, 160 LED/m
1 × 90,00 €
AURORA EDLM™ PRO GU10 FIXED LOCK RING DOWNLIGHT SATIN NICKEL
1 × 7,50 €
FastFix LED linear system replacement lens 30° beam angle
1 × 12,00 € Subtotal: 914,50 €
7-14 Days
42,00 €
Price without 24% VAT: 33,87 €
| Width (mm) | |
|---|---|
| Length (mm) | |
| Dimmable (adj. brightness) | |
| Brands | |
| In stock (Vana-Tartu mnt 79A) | No |
| Out of Stock Delivery Time From Supplier | 7-14 Days |
Only logged in customers who have purchased this product may leave a review.

for 1,5m LED module bar five lens plates are needed
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

for a 1,5m LED module bar five lens plates are needed
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

for a 1,5m LED module bar five lens plates are needed
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

8 pole 2,5qmm (L1, L2, L3, N, PE, Dimm+, -, CHR)permanent power regula
7-14 Days

for a 1,5m LED module bar five lens plates are needed
7-14 Days


There are no reviews yet.